Factors that affect the construction cost of a project: Construction costs depend on many factors. Learn about the factors that can affect the construction cost of your building.
Construction cost is one of the many factors that you need to consider, and it can be affected by several things. Find out more in this article, to help you make informed decisions when it comes to building or renovating your home.
Clients are most concerned about the cost of construction. Clients often ask about the costs of the project and whether it can be done at a lower price.
The cost of any construction project is affected by many factors. These factors include the client's priorities, the nature of the project, and the designer responsible for the building design. They also influence the choice of procurement options, market conditions, legislative constraints, and other factors.
Factors that Influence the Cost of a Project :
A project's construction cost is influenced by several factors: There is a lot to consider when you're estimating the construction cost for a project - location, architectural design, building materials, and more. But what about the other factors? In this article, we'll take a look at some of the factors that can affect the price of your construction project.
1. Priorities of the client
All construction is done for the client's benefit. The client's expectations should be met or they will be unhappy. Client priorities are different. One client's priority may not be the same as another. Priorities can be categorized into three categories: quality, cost, and time.
1.1 Quality
Quality is important and will remain in your mind long after the price tag is forgotten. If a project is not completed within the budget and on time, it will be deemed a failure. When constructing a building, quality should always be considered.
Quality includes pleasing appearance, avoiding defects upon completion, fulfilling the purpose, supporting worthwhile guarantees, satisfactory durability, customer delight, and satisfying longevity. While some of these elements are included in the design, others depend on the contractor's execution on the spot.
It is crucial to follow the briefing of the client when designing and building. However, buildings that are too detailed, or require the use of expensive materials and skilled craftsmanship, will result in a higher total cost.
1.2 Price
Clients are most interested in a lower cost of building their homes. However, this can compromise the structure's quality. A project can become financially driven if it does not have enough money. This means that cheaper alternatives are more desirable than more sustainable options.
Clients may have a fixed budget that requires contractors to control costs to deliver the project within the budget. A limited budget may limit the benefits of features and lead to excessive running costs.
Good design doesn't necessarily require a large budget. Design should be cost-effective in terms of both operational and total costs. The client and the designer should discuss energy costs, maintenance costs, as well the building's appearance and efficient use of space.
1.3 Time
Some clients place time as their top priority. Clients may want to be able to gain tax incentives or establish a market presence before competitors when a major sporting event is planned. Time can be a priority in emergencies like floods, fires, or earthquakes.
Rapid construction allows for early contractor appointments and a faster design process where design and construction operations can be performed simultaneously. This requires increased work hours, overtime payments, intensive management, and the use of subcontractors, and suppliers, which all increase construction costs.
Keep Reading: How much does it Cost of Quality to build a house?
2. Nature of the Project
The cost of executing a project is determined by its specific characteristics. There are many design options for buildings, so it is difficult to predict the total cost. The cost of certain buildings, like schools, can be predicted with great accuracy.
2.1 The Choice of an Architect
The selection of an architect is a key factor in any project. It will reflect the priorities of clients, particularly those that relate to cost and quality. High-quality design practices are used by clients who wish to create landmark developments or high-quality buildings. Because these clients have high expectations, they are often willing to pay more for prestigious projects.
2.2 The Function of the Building
Costs will be affected by the function of the building. The housing costs vary between apartments and commercial buildings. The cost of amenities such as theaters, sports, and conference centers can't be compared to public infrastructures like schools or hospitals.
3. Design costs
Construction costs are greatly affected by the geometry of the building. This includes its size, shape, and complexity. Larger buildings will have more square meters of floor space with regular, rectangular floor plans and elevations than smaller buildings that are complex, curved, or angular.
Easy setting up and useable solutions result in higher productivity and less waste. Complex layouts, on the other hand, take longer to assemble and can require more trades that may pose greater risks and deficiencies.
Special features can make buildings more expensive, which could lead to higher costs. The cost of the project will be affected by the attitude towards sustainability and the entire life cycle cost.
4. Nature of the Site
4.1 Location
Cost is affected by the location of the project. It is not a good idea to build low-value developments in high-value areas.
4.2 Conditions of the Physical Site
How a building is designed and built will depend on its natural features, ground obstructions, and adjacent buildings.
Sloped sites are difficult to work on and can pose a risk to workers' lives. Brownfield sites can be more costly to build on than greenfield ones because they will require demolition, clearing, and remediation.
4.3 Services available
It is important to consider where, how many, and what their capabilities are. If these services are not easily accessible or located far from the building, it may prove costly to link the building with them.
5. There are many options for procuring
There are many options for procuring projects. Below are the most popular procurement methods, as well as their impact on project costs.
5.1 Traditional Procurement
Traditional procurement involves the client selecting consultants to design the project, choosing a contractor, and overseeing the work until completion.
Traditional procurement prioritizes quality and produces effective economic design for most projects.
Traditional procurement has the disadvantage of a longer project duration due to the requirement to complete the design before tendering.
5.2 Design and Build Procurement
This method allows a contractor to provide both design and construction under one contract. This method allows clients to get projects done quickly at a competitive price.
A contractor can design and build procurement, which allows them to combine design and construction. There is very little room for mistakes and modifications.
This is not a good option if the client has unclear requirements. The quality of the project could be compromised.
5.3 Management Procurement
A contractor is responsible for managing the procurement of a project and works closely with the design team to provide construction management services.
The management contractor does not perform design work or physical construction. The physical construction is performed by subcontractors.
The management procurement route is associated with complex, fast-moving construction projects. These projects are often very costly.
Keep Reading: Is it better to buy or build your dream home?
6. Construction Method
The cost of a project will be determined by the amount that a successful tending contractor charges to execute the work. The cost of materials, labor costs, the cost of the plant, the competitiveness of subcontractors, and the cost of operating the site all affect the cost. These costs must be accounted for by the contractor, who will also need to include contingencies and profit margins.
7. Prevailing Market Conditions
Construction is sensitive to economic conditions and changes in local and national acts. Construction activity thrives during economic growth but is affected by economic downturns.
8. Legislative constraints
This legislation governs how developments are carried out. Higher minimum standards for planning, construction safety, environmental protection, and other aspects of development lead to better developments. However, this comes at a cost.
Other Factors that Affect the construction cost of a project
Several other factors affect construction costs, including:
-The type of project: Residential construction typically costs less than commercial construction, for example.
-The location of the project: Construction in urban areas tends to be more expensive than in rural areas.
-The size of the project: Larger projects tend to cost more than smaller ones.
-The complexity of the project: More complex projects tend to cost more than simpler ones.
-The schedule of the project: Rush jobs typically cost more than projects with longer timelines.
Frequently Asked Questions that Affect the construction cost of a project
What are the factors that influence the cost of project construction costs?
- Priorities of the client
- Nature of the Project
- Choice of Architect
- The Building's Function
- Design costs
- Nature of the Site
- There are many options for procuring
- Construction Method
- Prevailing Market Conditions
- Legislative constraints
How to Calculate Construction Costs?
To calculate the construction cost of a project, you will need to take into account a few different factors.
- The first factor is the size of the project. The larger the project, the more it will cost to construct.
- The second factor is the location of the project. If the project is located in an area with a high cost of living, it will likely be more expensive to construct than if it were located in a less expensive area.
- The third factor is the type of materials used in construction. Some materials, such as steel and concrete, are more expensive than others, such as wood.
- The fourth factor is the time frame for construction. If you are looking to have your project completed quickly, it will likely be more expensive than if you are willing to wait for a longer period.
- Finally, the last factor to consider is any special features or amenities that you may want to be included in your project. These can add significant costs to a project, so be sure to include them in your calculations.
What are the major design factors that affect the construction costs of a project?
- Plane shape
- The building's size
- Wall-to-floor ratio
- Gradient of circulation space
- Stocky heights
- The total height of the building
What is procurement in construction?
Procurement refers to the process of procuring all goods and services needed for a project.
What is traditional procurement?
Traditional procurement involves the client selecting consultants to design the project, choosing a contractor, and overseeing the work until completion. Traditional procurement prioritizes quality and produces economic design for most projects.
Conclusion
In conclusion, there are a variety of factors that affect the construction cost of a project. By understanding these factors and how they impact the final cost, you can be better prepared when planning your next construction project. Keep these factors in mind during the planning process to help ensure that your project stays on budget.
Thank you for reading our article about the factors that affect the construction cost of a project.
Beyond Bricks provide quality construction for your dream home. Click here for a quotation